Flooring scope responsibility matrix

Use a line-by-line responsibility record to distinguish included work, exclusions, allowances, and items requiring clarification.

This is a planning aid. It does not assign responsibility on a particular project or change a contract. Populate it against the actual drawings, specification, site information, and bid instructions.

Confirm the responsible party and commercial treatment for each item
Scope itemRecord against the packageConfirm explicitly
Floor finishRoom / finish code / specificationProduct, format, layout, and quantity basis
Base and accessoriesBase schedule / detailsHeight, type, terminations, and extent
TransitionsDoorways / material changesProfile, finish, elevation, and responsible trade
Existing floor removalDemolition plan / site recordMaterial, disposal, and work limits
Adhesive removalExisting conditions / preparation requirementExtent, method restrictions, and acceptance criteria
Substrate repairsKnown condition / site reviewDefined repair, allowance, or clarification
TestingProduct / project specificationWho arranges, pays, reviews, and responds
Mitigation / levelingTest result / elevation informationSpecified work versus a conditional allowance
Furniture movementPhasing / access planRemoval, storage, and return
Protection and cleaningProgramme / closeout requirementsInstallation protection versus later-trade protection

Record a treatment, not just a tick

For each item, identify the responsible party and whether it is included in the base bid, priced as an alternate, carried as an allowance, excluded, or awaiting clarification. Add the drawing, specification, or correspondence reference supporting the decision.

Keep revisions traceable

When the package changes, record which matrix items changed with it. A new finish code, revised area, or adjusted phase boundary can affect more than the material quantity. Share clarifications consistently so proposals can be compared against the same basis.